69ɫ

Central Asia Energy News Digest Issue 10 (31 May 2019)

Central Asia Energy News Digest Issue 10

Date:16 – 31 May 2019

Kyrgyzstan

Member of Parliament without prior experience in the energy sector to head the National Energy Holding

In Russian:

NESK needs to raise electricity tariff to achieve profitability

In Russian:

Eurasian Fund to finance the modernization of Uch-Kurgan HPP

In Russian:

Ministry of Economy to combat illicit fuel market

In Russian:

Rasul Umbetaliev: Kyrgyz Government to buy another 400 thousand tons of Kazakh coal for Bishkek TPP

In Russian:

Bishkekteploset launches Heat Supply Improvement Project

In Russian:

Information on the financial situation of NES Kyrgyzstan (national grid operator)

In Russian:

One in four liters of gasoline in Kyrgyzstan sold illegally

In Russian:

Kyrgyzstan may remain without Kazakh gasoline due to long negotiations

In Russian:

Gas stations to get an electronic system for controlling sale of petroleum products

In Russian:

Government won’t increase electricity tariffs until sector reform is completed

In Russian:

500,000 tons of coal to be produced at Kara Keche in 2019

In Russian:

Uzbekistan

Gas and electricity prices to increase from June

In Russian:

Rosatom confirms that Uzbekistan’s NPP will be built close to Aydarkul reservoir

In Russian:

On the use of renewable energy sources - Text of the new law on renewable energy signed by the President on 21 May 2019

In Russian:

Fergana refinery to set product prices independently

In Russian:

Uzbekistan invited to intensify its Energy Charter participation

In Russian:

Restricting enterprises in the choice of energy inputs used will affect inflation - Central Bank

In Russian:

Azeri company Socar to increase oil production in Kashkadarya

In Russian:

Russian standards to be used during NPP construction

In Russian:

Road map for the 2019-2020 NPP construction signed

In Russian:

Capacity development - a priority in the implementation of the NPP project in Uzbekistan

In Russian:

Ministry of Energy to establish joint venture with French company

In Russian:

Tajikistan

Tajik electricity exports to Afghanistan: direct or via transit through Uzbekistan?

In Russian:

Rogun HPP set to raise equity capital

In Russian:

Tajikistan committed to train Afghan specialists in energy and medicine

In Russian:

Kazakhstan

14 MW solar plant to be built in Turkestan region

In Russian:

KazTransOil and Transneft discuss compensations for dirty oil

In Russian:

Solar and wind power plants to be built in the Turkestan region

In Russian:

100 new electric buses to be added to the capital’s public transport

In Russian:

Kazakhstan is ready to discuss with OPEC conditions for reducing oil production

In Russian:

Kazatomprom sells 75% share in three renewable energy subsidiaries

In Russian:

Kazakhstan prepared to raise Kazatomprom’s free float - official

In English:

Russia halts transit of Kazakh LPG and coal to Ukraine - document

In English:

Exclusive: Total seeks to reduce stake in giant Kashagan oilfield - sources

In English:

Kazakhstan aims to raise $3-$5 bln from state energy firm sale, says official

In English:

Turkmenistan

TAPI gas pipeline – a new round of talks to be held in Avaza

In English:

Petronas aims to expand cooperation with Turkmenistan

In English:

Blue fuel of Turkmenistan – blue sky of the Middle Kingdom

In English:

Large oil companies at the anniversary gas congress of Turkmenistan

In English:

Gas contract with the Russian Federation will reduce the relevance of the Trans-Caspian gas pipeline for Turkmenistan

In English:

Turkmen delegation took part in the World Hydropower CongressIn Russian: US calls on Turkmenistan to join Southern Gas Corridor

In English:

Tadjibay: a new field of sulfur-free gas

In Russian:

Other regional news

Will the new Russian doctrine be able to accelerate the creation of a common energy market in the EAEU?

In Russian:

New European Union Seven Million Euro Grant to Strengthen Water and Energy Security in Central Asia

In English:

Melting glaciers threaten Asia's drought buffer, scientists warn

In English:

Analysis

Barriers to renewable energy sector development in Uzbekistan

In English:

Rogun HPP: technical and financial problems, and the lack of transparency

In Russian:

Large and small hydropower plants: What can be built in the future? (maps, power)

In Russian:

Is another “Chernobyl” possible in Central Asia?

In Russian:

Positive energy: anniversary summit to strengthen the EAEU

In Russian:


Phone: +996 (312) 915000 ext. 326, 327

Email: tspc@auca.kg

Address: 7/6 Aaly Tokombaev Street, Bishkek, Kyrgyz Republic 720060

 

FAQ


American University of Central Asia
7/6 Aaly Tokombaev Street
Bishkek, Kyrgyz Republic 720060

Tel.: +996 (312) 915000 + Еxt.
Fax: +996 (312) 915 028